God of War Laufey will now arrive on May 20, 2027 after Sony Santa Monica pushed it out of its February window. The move shifts one of 2027's most watched PlayStation releases and gives the studio a longer runway before launch.
The game had been slated for February 16, 2027, and Sony Santa Monica said it needs more time to make something that meets fan expectations. Cade Onder, an IGN freelancer who covers entertainment including gaming and film, reported the change as the studio reset the timetable.
Sony Santa Monica shifts May 20
May 20, 2027 is now the date buyers should use for planning around God of War Laufey. Sony Santa Monica also said it will share more details on the game soon, which puts the next meaningful update on the studio's schedule rather than the old February release plan.
2018 is the starting point for the story this game will continue, and Laufey is the protagonist this time. Kratos is expected to have a role in the new game, while a new Kratos-led God of War game is also actively in the works.
February 16 and the collector's box
February 16, 2027 mattered because the studio had just announced a collector's box designed to line up with that release date, even though the box does not include the game. That sequence makes the delay more than a simple calendar adjustment: the merch plan was built around the earlier window, and the release shift breaks that match-up.
The February 2027 window had become crowded, and some games, like Fable, moved from a fall 2026 release to early 2027 to avoid the blast zone of GTA 6. Sony Santa Monica is making the opposite call here, leaving that period and buying itself more time to finish the game on its own terms.
What players should watch
May 20, 2027 now replaces February 16, 2027 as the date that matters, and the studio's next details should explain how far along the game is and how much of the release plan is still being held back. For players who had been lining up around the February slot, the practical change is simple: the wait got longer, but the studio is signaling that it would rather miss the earlier date than ship before it is ready.







